Knowsley BSF Learning Centre 4
Alco Beldan have been involved in BSF projects from the earliest days of the programme, working with top Contractors and Architects, on more than 10 Local Authority schemes totalling in excess of 500 movable walls. With many individual projects complete our walls are now being used in classrooms, multi-use halls, drama studios, music rooms and auditoriums resulting in fantastic feedback from both teaching and facilities management staff.
- The first Transform School
- One of initial seven schools in Knowsley BSF
- More than 70 Movable Walls designed in this phase
- School built on 9m grid to enable future adaptability based on class sizes
- Acoustics: 55 dB Rw, to meet BB93 requirement for teaching areas to achieve 45dB DnTw
- Product: NW100


